Fibre ducting and Tee levelling work

Since October Abbotts have been installing fibre optic ducting throughout the links. 

Two lines of 60mm ducting are being mole ploughed around the perimeter of Dunluce links where spurs will reach more localised areas within the course.


This week on the course we are levelling the par 3 6th tee on Dunluce which will be complete by the weekend. The banking on the left side has been softened and graded into the grass path.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s