Pre Christmas project works

This week we shall carry out some drainage work on the Valley to tackle some areas which can become wet in winter. There was a clay pipe drainage but, inevitably this was disturbed during the installation of our irrigation system in 2009 when irrigation pipes were installed using a mole plough. The majority of the work will be complete by the weekend. Holes to be drained include 4th, 5th, 10th & 11th.

There are some small additions to spectator areas, and also a few additional services to be installed over the next number of weeks, as well as the tunnel ends to be removed before flooring is laid.

None of this work around Dunluce will affect how the course plays.

New pathway must be laid to allow access from the hockey pitch to the links which is necessary for tv buggies next year.